SStoneSydney stone fabrication
KD
Khoa DoWorker · khoa@stone.com.au
My Account
Switch backSigned in as WorkerSign out

Site measure

PRJ-2607 Neutral Bay island + splashback · Kingsley Projects · sheet v1 · measured 12/08/2026 by Khoa Do
9:41●●● ▢
‹Site measure
PRJ-2607 · Neutral BayMeasuring
Island + splashback · Kingsley Projects
23 Wycombe Road, Neutral Bay NSW 2089
CoordinatorSarah Mitchell
Due on site02/09/2026
Sheetv1 · production measure · draft
Measured so far
3 lines · 4 pieces6.06 m²
Island top · 2600 × 1050 mm2.73 m²
Waterfall ends × 2 · 900 × 1050 mm1.89 m²
Splashback · 2400 × 600 mm1.44 m²
3 of the 4 areas on the drawing are measured. The laundry return is still to do.
Add a line
Stand square to the wall and get both ends in.
When the sheet is complete
Send v1 to the officeDraft
Sarah Mitchell is the coordinator on PRJ-2607. Cutting starts on the approved revision, so nothing goes on the saw until she has the sheet.

Four pieces, 6.06 m² of finished surface, three photographs. Your name and the time go on the sheet.

Also
Scan a code
Open a slab, an off-cut or a work order from its label
My work today
Back to the jobs on your list