Delivery docket and handover pack, ready to print.
Delivery docket DD-1187
Project PRJ-2601 — Mosman
Deliver to 8 Raglan St, Mosman NSW 2088
Date 18/08/2026, 7:30am – 11:00am
Crew Install A — Peter Walsh
Vehicle Truck 1 — crane · driver Dung Vu
Deliver to 8 Raglan St, Mosman NSW 2088
Date 18/08/2026, 7:30am – 11:00am
Crew Install A — Peter Walsh
Vehicle Truck 1 — crane · driver Dung Vu
Stone Pty Ltd
ABN 41 615 208 774
Unit 4, 22 Foundry Rd
Seven Hills NSW 2147
(02) 9674 8800 · accounts@stone.com.au
ABN 41 615 208 774
Unit 4, 22 Foundry Rd
Seven Hills NSW 2147
(02) 9674 8800 · accounts@stone.com.au
| Piece | Description | Size (mm) | Source slab | Delivery state |
|---|---|---|---|---|
| 1 | Main kitchen — run A | 2410 × 640 × 20 | S-01188 | Cut |
| 2 | Main kitchen — run B | 1840 × 640 × 20 | S-01188 | Cut |
| 3 | Island — top | 2800 × 1100 × 20 | S-01187 | Cut |
| 4 | Island — waterfall left | 900 × 1100 × 20 | S-01187 | Cut |
| 5 | Island — waterfall right | 900 × 1100 × 20 | S-01187 | Cut |
| 6 | Butler’s pantry — bench | 2260 × 620 × 20 | S-00422 | Cut |
- Pieces on this load
- 6
- Access
- Kerbside crane lift · driveway clear from 7:00am
- Received by
- ________________________________
- Signature
- ________________________________
- Date and time received
- _____ / _____ / 2026 _____ : _____
Check every piece against this docket before signing, and write any damage or shortfall on the docket at the door. This docket says what arrived on site; it carries no price and is not an invoice.
Handover pack — PRJ-2590 Willoughby
To Northshore Developments
Site 26 Warrane Rd, Willoughby NSW 2068
Work completed 01/08/2026
Coordinator Sarah Mitchell
Warranty to 01/08/2028
Site 26 Warrane Rd, Willoughby NSW 2068
Work completed 01/08/2026
Coordinator Sarah Mitchell
Warranty to 01/08/2028
Stone Pty Ltd
ABN 41 615 208 774
Unit 4, 22 Foundry Rd
Seven Hills NSW 2147
(02) 9674 8800 · accounts@stone.com.au
ABN 41 615 208 774
Unit 4, 22 Foundry Rd
Seven Hills NSW 2147
(02) 9674 8800 · accounts@stone.com.au
| Piece | Where it is fitted | Stone / lot | Source slab | Installed |
|---|---|---|---|---|
| CMP-2101 | Kitchen — main run | Calacatta OroLOT-A2417 | S-01162 | 29/07/2026 |
| CMP-2102 | Kitchen — island | Calacatta OroLOT-A2417 | S-01163 | 29/07/2026 |
| CMP-2103 | Butler’s pantry — bench | Calacatta OroLOT-A2417 | S-01163 | 29/07/2026 |
| CMP-2104 | Laundry — bench | Absolute BlackLOT-B1102 | S-01158 | 31/07/2026 |
| CMP-2105 | Ensuite — vanity | Carrara BiancoLOT-A2201 | S-01151 | 31/07/2026 |
| CMP-2106 | Main bathroom — vanity | Carrara BiancoLOT-A2201 | S-01151 | 31/07/2026 |
- Before photographs
- 9 images · visit 1, 29/07/2026
- After photographs
- 12 images · visit 3, 01/08/2026
- Signed off
- 01/08/2026 4:42pm · signature captured on visit 3
- Site report
- Nam Tran · 01/08/2026
- Open defects
- None
- Warranty
- Two years from 01/08/2026 · expires 01/08/2028
Care and cleaning: wipe with warm water and a neutral pH cleaner. Do not use bleach, oven cleaner or abrasive pads, and stand hot pans on a trivet. Report a chip or a stain to us before any repair is attempted — a repair attempted first can end the two-year warranty on that piece.
State variants
- empty — inherits report-empty
- loading — inherits report-loading
- access denied — inherits report-access-denied
- validation error — inherits report-validation-error
These are displays of THIS screen, not new screens. Each inherits the report archetype exemplar, which is drawn once and carries the words the built screen shows.