Install visits/Planned visit

Install visit — Planned

Scheduling and non-personal operational data remain available.

Available now

Status
Planned
Permitted work
Maintain date, crew, vehicle and planned component manifest within the role grant.
Blocked progression
Delivered, Installed, Signed Off, Refused and Closed are unavailable until customer-home privacy evidence is accepted.
Blocked content
Photographs, signature/refusal evidence, install outcomes, defects and customer-evidence metadata are not returned.
🔒
Unavailable until activation requirements are accepted.This section illustrates behavior only after the customer-home privacy evidence is accepted. It is not an available action, current record, count or reportable projection.

PRJ-2598 — visit 9, unit 9

12/08/2026 · Install A · Peter Walsh, Minh Ha · truck 1

Pieces taken

Pieces taken
PiecePositionSize (mm)Visit-line disposition
CMP-118Unit 9 kitchen — run A2200 × 620Installed
CMP-119Unit 9 kitchen — run B1600 × 620Installed
CMP-120Unit 9 splashback2200 × 600Installed
CMP-121Main vanity1500 × 460Installed
CMP-122Second vanity900 × 460Installed
CMP-123Window sill1200 × 200Returned to factory — wrong size

Customer-site photographs unavailable

🔒
UnavailableNo customer-home image, thumbnail, attachment name or storage path is captured or returned until lawful purpose, notice, access and retention controls are accepted.

Supervisor report

Return visit needed

Defects

Defects
CodeDescriptionRaised byStatusOwner
PI-088Window sill CMP-123 is 40 mm out, returned to be recutPeter WalshOpenNam Tran
PI-087Silicone to the left wall corner not done — builder's tradePeter WalshOpen
While a defect is open the install record cannot be closed, and the project cannot move to Handover.

Customer signature evidence unavailable

🔒
UnavailableNo signer identity, role, signature, timestamp, note, refusal reason, threshold decision or substitute-evidence metadata is captured or returned before the required setup opens.
🔒
Customer-evidence transition unavailableThe refusal, threshold and substitute-evidence policy is not exposed as an active path until the required privacy setup is accepted.

Inactive future Install Visit states

Planned is the only operational state before privacy approval. Every later state below is a non-operative target reference.

Status guide
Lifecycle states and next steps for Install Visit
StateWhen shownWhat happens next
Planned This is an entry state. The Planned state keeps its audit history and only the appropriate controls remain available. Target transition after privacy approval: Delivered (Supervisor).
Delivered Reached from Planned. The Delivered state keeps its audit history and only the appropriate controls remain available. Target transition after privacy approval: Installed (Supervisor).
Installed Reached from Delivered. The Installed state keeps its audit history and only the appropriate controls remain available. Target transition after privacy approval: Signed Off (Supervisor; conditions apply); Refused (Supervisor; conditions apply).
Signed Off Reached from Installed. The Signed Off state keeps its audit history and only the appropriate controls remain available. Target transition after privacy approval: Closed (Coordinator; conditions apply).
Refused Reached from Installed. The Refused state keeps its audit history and only the appropriate controls remain available. Target transition after privacy approval: Closed (Coordinator; conditions apply).
Closed Reached from Signed Off, Refused. The Closed state keeps its audit history and only the appropriate controls remain available. No next lifecycle transition is declared; retain the record as governed history.