SStoneSydney stone fabrication
People/Timesheets/Bao Nguyen — 10/08/2026

Recorded day

Bao Nguyen · Factory · Stonemason — polish · Monday 10/08/2026 · Approved and locked
Attendance8.0 h06:57 – 15:28 less a 30 min break
Allocated to jobs7.2 h3 work sessions, derived from the presses
Workshop overhead0.8 hshift time not booked to a job
Labour posted$336.008.0 h at $42.00/h · ex GST

Recorded attendance

Monday 10/08/2026
Bao Nguyen
10/08/2026
06:57
15:28
30
Ordinary day
Attendance is the shift less the break — 8.0 h on this day. The crew leader corrects and confirms a recorded day and the bookkeeper approves and locks it; this page reads the day as it stands.

Person and day

Person
Bao Nguyen
Crew
Factory · Stonemason — polish
Crew leader
Nam Tran
Day
Monday 10/08/2026
Status
Approved and locked
Allocation source
Derived from sessions
Confirmed by
Nam Tran · 10/08/2026 4:12pm
Approved by
Linh Hoang · 11/08/2026 9:20am
Unlocks
1 · 11/08/2026 by Linh Hoang
Internal rate
$42.00/h · in force from 01/07/2026

Hours allocated to jobs

10/08/2026 · derived from 3 work sessions
Hours and labour allocated to jobs on 10/08/2026
Work orderProjectTaskSessionHoursLabour
WO-3319PRJ-2601Mosman kitchen & butler's pantryFactory Polish07:04 – 10:343.5 h$147.00
WO-3317PRJ-2604Randwick 2 vanitiesFactory Polish11:04 – 13:222.3 h$96.60
WO-3319PRJ-2601Mosman kitchen & butler's pantryFactory Polish13:32 – 14:561.4 h$58.80
—Workshop overheadnot booked to a jobSet-up, pad changes, clean downbetween sessions0.8 h$33.60
7.2 h went to jobs and 0.8 h stayed on workshop overhead. WO-3319 took 4.9 h over two sessions and WO-3317 took 2.3 h. The presses behind these sessions are read on the work events.

What happened on this day

  • 10/08/2026 6:57am
    Start pressed on the phone at the workshop door.
  • 10/08/2026 7:04am
    Work session opened on WO-3319 — factory polish, Mosman benchtops.
  • 10/08/2026 10:34am
    Break taken 30 min; back on the floor at 11:04am.
  • 10/08/2026 11:04am
    Work session opened on WO-3317 — factory polish, Randwick 2 vanities.
  • 10/08/2026 1:32pm
    Back on WO-3319 for the last 1.4 h of the shift.
  • 10/08/2026 3:28pm
    Finish pressed on the phone at the workshop door.
  • 10/08/2026 3:36pm
    Hours allocated from 3 work sessions — 7.2 h to jobs, the rest to workshop overhead.
  • 10/08/2026 4:12pm
    Confirmed by Nam Tran — the day closed to ordinary correction and went to the bookkeeper.
Nothing here is edited. The presses and the sessions they opened are kept as they were made, and a correction is appended beside them.

Labour posted to the cost ledger

Bao Nguyen · 10/08/2026
WO-3319 · Factory Polish
$205.80 · 4.9 h on PRJ-2601
WO-3317 · Factory Polish
$96.60 · 2.3 h on PRJ-2604
Workshop overhead
$33.60 · 0.8 h not booked to a job
Net posted
$336.00 · 8.0 h at $42.00/h
Cost lines posted for 10/08/2026
PostedLineAmountState
10/08/20265:05pmLabour — 10/08/20267.8 h at $42.00/h$327.60Reversed
11/08/20269:12amReversal of the 10/08 postingbreak corrected on unlock−$327.60Reversal
11/08/20269:20amLabour — 10/08/20268.0 h at $42.00/h$336.00Posted
Approved on 10/08/2026, unlocked the next morning to correct the break, then approved again. Nothing is edited in place: the first posting is reversed and the corrected one is written beside it. Read these lines among the rest in the cost ledger.