SStoneSydney stone fabrication
Projects/PRJ-2601/Measure sheet v3

Measure sheet v3

PRJ-2601 Mosman kitchen & butler’s pantry · production measure · submitted 11/08/2026 by Peter Walsh · v2 remains the effective revision
Open projectPending

Measured items

7 lines, 8 pieces13.20 m²
Measured lines on revision v3
AreaDescriptionLengthDepthQtyAreaEdgeNotes
Main kitchenBenchtop run A2410 mm640 mm11.54 m²Mitred 40 mmCabinet datum recorded; sink centre 980 mm from the left
Main kitchenBenchtop run B1840 mm640 mm11.18 m²Mitred 40 mmCooktop cut-out 600 × 520
Main kitchenSplashback2410 mm600 mm11.45 m²Pencil roundFull height to the underside of the overheads
IslandTop2800 mm1100 mm13.08 m²Mitred 40 mmBook-matched to run A
IslandWaterfall ends900 mm1100 mm21.98 m²Mitred 40 mmBoth ends, vein continued over the mitre
Butler’s pantryBenchtop3200 mm640 mm12.05 m²Mitred 40 mmUndermount sink cut-out 540 × 400
Butler’s pantrySplashback3200 mm600 mm11.92 m²Pencil roundNew on v3 — not measured on v2
Total813.20 m²
The sheet measures 13.20 m² of finished surface across 8 pieces, 1.92 m² more than v2, which measured 11.28 m² in total. Quotation QT-1188 was priced on 28.40 m² of slab, so yield on this job is read from the cut plan rather than from this sheet.

What changed on v3

1 line added
Difference between v2 and v3
Linev2v3Why
Butler’s pantry splashback—3200 × 600 · 1.92 m²Added by the client on the day of the site re-check.
Island top2790 × 11002800 × 1100Cabinetry set 10 mm wider than the Rev A drawing.
Main kitchen run B1840 × 6401840 × 640Unchanged; the cooktop cut-out moved 30 mm to the right.
v2 measured 11.28 m² and v3 measures 13.20 m² of finished surface. Cutting stays on v2 until a director approves v3.

Revision trail

Where v3 has been and where it standsPending
Revision trail for measure sheet v3
StateOn this revisionDateDetail
DraftPassed10/08/2026Started by Peter Walsh from the v2 lines after the site re-check.
FinalNot entered—Final belongs to the quoting measure. On this job that was v1, which priced QT-1188.
PendingCurrent11/08/2026Submitted by Peter Walsh at 4:42pm and waiting on Hung Le.
ReturnedNot entered—v3 has not been returned for correction.
ApprovedNot yet—v2 has been the effective fabrication revision since 09/08/2026 and stays in force until v3 is approved.
Approved with exceptionNot entered—No exception reason has been recorded against v3.
SupersededNot yet—v3 supersedes v2 only once it is approved. v1 was superseded on 09/08/2026.
Draft and Pending belong to the production measure. Final belongs to the quoting measure, which needs no internal approval because the customer’s acceptance of the quote is the decision.