PRJ-2601 — Mosman kitchen & butler's pantry
Created from enquiry 04/07/2026 · Harbourline Constructions · coordinator Sarah Mitchell
StatusIn Productionproduction measure v2 in force since 09/08/2026
Work orders finished1 of 4WO-3319 is with QC · three orders still to run
Due on site18/08/2026builder ready 14/08/2026
Reserved stone2 slabsS-01187 and S-01188 · zone K1
Project activity
- 04/07/2026Project created from the enquiry · Sarah Mitchell allocated PRJ-2601 and attached Harbourline's Rev A drawings.
- 20/07/2026Quote measure v1 marked Final · measured by Mark Reilly and used to price QT-1188.
- 22/07/2026QT-1188 v1 sent · the sent revision was locked while the customer decided.
- 29/07/2026QT-1188 marked Won · the project moved from Quoting to Measuring and kept its code.
- 06/08/2026VAR-0139 accepted by the customer · the butler's pantry splashback joined the scope.
- 07/08/2026Production measure v1 returned by Hung Le · the island cut-out centre disagreed with the cabinet datum.
- 09/08/2026Production measure v2 approved by Hung Le · the signed sheet is on file and v2 is in force for the four open work orders.
- 11/08/2026PKG-2601-01 accepted · the crane and transport package is Planned for 17/08/2026.
- 12/08/2026WO-3319 sent to QC · Tuan Pham and Nam Vo completed the factory-polish work.
Quick facts
- Customer
- Harbourline Constructions
- Main contact
- Mark Reilly
- Site
- 8 Raglan St, Mosman NSW 2088
- Site contact
- Tim Foley · 0491 570 010
- Coordinator
- Sarah Mitchell
- Enquiry created
- 04/07/2026
- Builder ready
- 14/08/2026
- Due on site
- 18/08/2026
- Stone
- S-01187 and S-01188 · Calacatta Oro LOT-A2417 · Reserved in K1
- Subcontract package
- PKG-2601-01 · Planned · due 17/08/2026
Measure versions
Open measure sheet| Version | Measured | Status | Approval | |
|---|---|---|---|---|
| v3Production measure | 12/08/2026 · Peter Walsh | Draftsplashback height re-checked against the site datum | Not submitted — v2 stays in force | |
| v2Production measure | 09/08/2026 · Peter Walsh | Approved | 09/08/2026 · Hung Leproduction-measure-v2-signed.pdf | |
| v1Production measure | 07/08/2026 · Peter Walsh | Supersededreplaced when v2 was approved | 07/08/2026 · returned by Hung Le | |
| v1Quote measure | 20/07/2026 · Mark Reilly | Finalpriced QT-1188 v1 | Not required |
Production v2 is the revision all four open work orders are cut to.
Pieces and measure lines
7 pieces| Component | Measure line | Position / actual size | Specification | Slab allocation | Work order |
|---|---|---|---|---|---|
| CMP-01 | ML-01 | Run A · 2410 × 640 × 20 | Mitred 40 edge · 1 cut-out · undermount sink | S-01188 | WO-3318Assigned |
| CMP-02 | ML-02 | Run B · 1840 × 640 × 20 | Mitred 40 edge · no cut-out | S-01188 | WO-3318Assigned |
| CMP-03 | ML-03 | Island top · 2800 × 1100 × 20 | Mitred 40 edge · 1 cut-out · cooktop | S-01187 | WO-3319Pending QC |
| CMP-04 | ML-03 | Waterfall left · 900 × 1100 × 20 | Mitred 40 edge · vein continues from the top | S-01187 | WO-3319Pending QC |
| CMP-05 | ML-03 | Waterfall right · 900 × 1100 × 20 | Mitred 40 edge · vein continues from the top | S-01187 | WO-3319Pending QC |
| CMP-06 | ML-04 | Butler's pantry bench · 2260 × 620 × 20 | Pencil round edge · 1 cut-out · drop-in sink | Not allocated | WO-3320Queued |
| CMP-07 | ML-05 | Splashback · 3100 × 600 × 20 | Pencil round edge · verify against the site datum | Not allocated | —no work order raised yet |
7 pieces on production measure v2 — 5 are cut from S-01187 and S-01188; CMP-06 sits on queued order WO-3320 and CMP-07 has no work order yet.
Current work orders
All work orders| Order | Stage | Assigned to | Actually done by | Measure | Due | Status | |
|---|---|---|---|---|---|---|---|
| WO-3318 | Cut | Khoa Do | — | Production v2 | 14/08/2026 | Assigned | |
| WO-3319 | Factory Polish | Factory crew | Tuan Pham · Nam Vo | Production v2 | 15/08/2026 | Pending QC | |
| WO-3320 | Cut | — | — | Production v2 | 17/08/2026 | Queued | |
| WO-3327 | Deliver | Install A | — | Production v2 | 24/08/2026 | Assigned |
Four work orders are open on PRJ-2601 — WO-3319 is with QC and WO-3320 still needs a cutter.
Files and drawings
3 files| File | Category | Version | Date |
|---|---|---|---|
| Mosman-kitchen-plan-RevC.pdf | Drawing | v3 | 06/08/2026 |
| Harbourline-contract-PRJ2601.pdf | Contract | v1 | 30/07/2026 |
| production-measure-v2-signed.pdf | Measure evidence | v1 | 09/08/2026 |
Rev C is the drawing the workshop is cutting to. Earlier revisions stay on file against the work that used them.
PRJ-2601 — Mosman · Cancelled
Cancelled 12/08/2026 by Sarah Mitchell · the job code and its history are kept
⛔
Cancelled. No new work order, measure or claim may be raised against PRJ-2601.
Cancellation event
- Status
- Cancelled
- Cancelled by / at
- Sarah Mitchell · 12/08/2026 4:42pm
- Reason
- Builder cancelled the stone scope after the cabinet programme changed
- Project code
- PRJ-2601 · unchanged
- Quotes and measures
- QT-1188, VAR-0139 and production measure v2 keep their revision histories
Consequences
- Stone
- S-01187 and S-01188 released through reasoned stock movements
- Work orders
- WO-3318, WO-3319, WO-3320 and WO-3327 keep their recorded history and close with a reason
- Subcontract package
- PKG-2601-01 cancelled before work started
- Customer
- Harbourline Constructions notified on 12/08/2026
Stage trail
In Production| Stage | On this job | Date | Detail |
|---|---|---|---|
| Enquiry | Passed | 04/07/2026 | Project code allocated; Harbourline's Rev A drawings attached. |
| Quoting | Passed | 22/07/2026 | QT-1188 v1 sent and retained as the won revision. |
| Lost | Not entered | — | QT-1188 was won on 29/07/2026, so no lost outcome is recorded. |
| Measuring | Passed | 29/07/2026 | Production measure v1 was followed by the approved v2 revision. |
| Approved | Passed | 09/08/2026 | Production measure v2 is the effective fabrication revision. |
| In Production | Current | 10/08/2026 | Work started 10/08/2026 — WO-3319 is finished and waiting on QC; WO-3318, WO-3320 and WO-3327 remain open. |
| Ready to Deliver | Not yet | — | WO-3319 is with QC and WO-3320 is queued; no piece is packed for the Mosman run. |
| Installing | Not yet | — | No install visit is booked for 8 Raglan St, Mosman. |
| Handover | Not yet | — | Due on site 18/08/2026; nothing has been handed to Harbourline yet. |
| Closed | Not yet | — | The current project remains In Production. |
| Cancelled | Not entered | — | No cancellation has been recorded against PRJ-2601. |
| Planned | 1 package | 11/08/2026 | PKG-2601-01 is planned and due 17/08/2026. |
| Active | None | — | No subcontract package on PRJ-2601 is active. |
| Completed | None | — | No subcontract package on PRJ-2601 is complete. |
Planned, Active and Completed track PKG-2601-01, the crane and transport package on this job.
State variants
- empty — inherits detail-empty
- loading — inherits detail-loading
- access denied — inherits detail-access-denied
- validation error — inherits detail-validation-error
These are displays of THIS screen, not new screens. Each inherits the detail archetype exemplar, which is drawn once and carries the words the built screen shows.
Project lifecycle states
- Enquiry — drawn on this page at #variant-enquiry
- Quoting — drawn on this page at #variant-quoting
- Lost — drawn on this page at #variant-lost
- Measuring — drawn on this page at #variant-measuring
- Approved — drawn on this page at #variant-approved
- In Production — drawn on this page at #variant-in-production
- Ready to Deliver — drawn on this page at #variant-ready-to-deliver
- Installing — drawn on this page at #variant-installing
- Handover — drawn on this page at #variant-handover
- Closed — drawn on this page at #variant-closed
- Cancelled — drawn on this page at #variant-cancelled
- Planned — drawn on this page at #variant-planned
- Active — drawn on this page at #variant-active
- Completed — drawn on this page at #variant-completed