S-01188 — full slab
Calacatta Oro · lot LOT-A2417 · 3200 × 1600 × 20 mm
Full slab details
- Status
- Reserved
- Stone
- Calacatta Oro — marble 20 mm
- Lot
- LOT-A2417 · 4 slabs in this lot
- Size
- 3200 × 1600 mm · 5.12 m²
- Finish
- Polished
- Location
- K1 · main warehouse
- Cost
- $1,486.00
- Goods receipt
- GR-0778 · cost locked 02/08/2026
- Lineage
- Parent S-01188 · root S-01188
1188
Lineage
- 02/08/2026Received as a full slab — root and parent are S-01188.
- Not yet cutNo off-cuts have been reconciled from this slab.
Movement history
| When | Action | By | Project / measure line | Reason |
|---|---|---|---|---|
| 09/08/2026 2:22pm | Reserved | Dung Vu | PRJ-2601 · ML-01 + ML-02 | Book-match kitchen runs |
| 04/08/2026 8:10am | Moved | Dung Vu | — | Delivery zone cleared |
| 02/08/2026 11:24am | Received | Dung Vu | GR-0778 | Passed receipt inspection |
Reservation
- Project
- PRJ-2601 — Mosman kitchen
- Approved measure
- Production measure v2
- Measure line
- ML-01 + ML-02
- Measure line coverage
- 2.72 m² required · 2.72 m² covered · 0.00 m² remaining
- Raw stock held
- 5.12 m² of stone held — not the area a measure line needs
- Hold reason
- Book-match the main kitchen runs before the balance is selected
- Reserved by
- Dung Vu · 09/08/2026 2:22pm
- Expires
- Expires 23/08/2026 Explicit expiry recorded on this reservation
Every release and every extension is recorded with its reason, and that record is kept.
Photos



S-01188 — Hold extended
full slab · Calacatta Oro · lot LOT-A2417
⏱
Hold extended.New expiry: 06/09/2026
Current state
- Stone
- S-01188
- Status
- Reserved
- Previous allocation
- PRJ-2601 · Production v2 · ML-01 + ML-02
- Current allocation
- PRJ-2601 · Production v2 · ML-01 + ML-02
- Expiry
- 06/09/2026
Append-only transition event
- Action
- Hold extended
- By / at
- Dung Vu · 09/08/2026 3:05pm
- Required reason
- Builder programme moved; preserve the selected match
- Record identity
- S-01188 retained; no replacement record created
S-01188 — Reservation released
full slab · Calacatta Oro · lot LOT-A2417
✓
Reservation released.Available for a new governed reservation
Current state
- Stone
- S-01188
- Status
- In Stock
- Previous allocation
- PRJ-2601 · Production v2 · ML-01 + ML-02
- Current allocation
- — none —
- Expiry
- —
Append-only transition event
- Action
- Reservation released
- By / at
- Dung Vu · 09/08/2026 3:05pm
- Required reason
- Project allocation changed; this stone is no longer required
- Record identity
- S-01188 retained; no replacement record created
S-00418 — off-cut
Taj Mahal Quartzite · 890 × 540 × 20 mm · retained from WO-3194
Off-cut details
- Status
- Reserved
- Stone
- Taj Mahal Quartzite — leathered 20 mm
- Size
- 890 × 540 mm · 0.48 m²
- Location
- K1
- Parent
- S-00981
- Root
- S-00841
- Source work order
- WO-3194
- Retained by / on
- Khoa Do · 18/06/2026
- Cost carried
- $141.50
Three-generation lineage
- GR-0712Root S-00841 — received in lot LOT-C0901.
- WO-3088Parent S-00981 — retained from the root.
- WO-3194S-00418 — retained and labelled by Khoa Do.
Reservation
- Project
- PRJ-2604 — Randwick vanities
- Approved measure
- Production measure v1 · Approved
- Measure line
- ML-R03 — vanity top
- Measure line coverage
- 0.42 m² required · 0.42 m² covered · 0.00 m² remaining
- Raw stock held
- 0.48 m² of stone held — not the area a measure line needs
- Hold reason
- Reserve the retained match for the vanity top
- Reserved by
- Dung Vu · 08/08/2026 9:15am
- Expires
- Expires 22/08/2026 Explicit expiry recorded on this reservation
Every release and every extension is recorded with its reason, and that record is kept.
Photo and label


S-00418 — Hold extended
off-cut · Calacatta Oro · lot LOT-A2417
⏱
Hold extended.New expiry: 05/09/2026
Current state
- Stone
- S-00418
- Status
- Reserved
- Previous allocation
- PRJ-2604 · Production v1 · ML-R03
- Current allocation
- PRJ-2604 · Production v1 · ML-R03
- Expiry
- 05/09/2026
Append-only transition event
- Action
- Hold extended
- By / at
- Dung Vu · 08/08/2026 9:35am
- Required reason
- Builder programme moved; preserve the selected match
- Record identity
- S-00418 retained; no replacement record created
S-00418 — Reservation released
off-cut · Calacatta Oro · lot LOT-A2417
✓
Reservation released.Available for a new governed reservation
Current state
- Stone
- S-00418
- Status
- In Stock
- Previous allocation
- PRJ-2604 · Production v1 · ML-R03
- Current allocation
- — none —
- Expiry
- —
Append-only transition event
- Action
- Reservation released
- By / at
- Dung Vu · 08/08/2026 9:35am
- Required reason
- Project allocation changed; this stone is no longer required
- Record identity
- S-00418 retained; no replacement record created
Status trail for S-01188
Every status this record has reached, and the one it holds nowReserved| Status | On this stone | Date | Detail |
|---|---|---|---|
| In Stock | Passed | 02/08/2026 | Received on GR-0778, labelled and stood at K1 with all 5.12 m² free to reserve. |
| Reserved | Current | 09/08/2026 | Held by Dung Vu for PRJ-2601 ML-01 + ML-02, reason recorded, expiring 23/08/2026. |
| Issued | Not yet | — | WO-3318 is assigned to Khoa Do and due 14/08/2026. The slab is still on the rack, not in workshop custody. |
| Consumed | Not yet | — | No cut reconciliation is recorded, so no component, off-cut or waste line names S-01188 as its parent. |
| Broken | Not entered | — | Nothing broken on this stone. 4 records in the register carry this status today. |
| Returned to Supplier | Not entered | — | Lot LOT-A2417 passed receipt inspection on 02/08/2026; none of its 4 slabs went back. |
| Missing | Not entered | — | Found at K1 on the 07/08/2026 stocktake. 3 records across K1 and K2 are missing today. |
Each line is an event on S-01188 itself. A status is never typed over: it changes through a recorded movement that carries its actor, time and reason.
State variants
- empty — inherits detail-empty
- loading — inherits detail-loading
- access denied — inherits detail-access-denied
- validation error — inherits detail-validation-error
These are displays of THIS screen, not new screens. Each inherits the detail archetype exemplar, which is drawn once and carries the words the built screen shows.
Slab lifecycle states
- In Stock — drawn on this page at #variant-in-stock
- Reserved — drawn on this page at #variant-reserved
- Issued — drawn on this page at #variant-issued
- Consumed — drawn on this page at #variant-consumed
- Broken — drawn on this page at #variant-broken
- Returned to Supplier — drawn on this page at #variant-returned-to-supplier
- Missing — drawn on this page at #variant-missing