SStoneSydney stone fabrication

S-01188 — full slab

Calacatta Oro · lot LOT-A2417 · 3200 × 1600 × 20 mm

Full slab details

Status
Reserved
Stone
Calacatta Oro — marble 20 mm
Lot
LOT-A2417 · 4 slabs in this lot
Size
3200 × 1600 mm · 5.12 m²
Finish
Polished
Location
K1 · main warehouse
Cost
$1,486.00
Goods receipt
GR-0778 · cost locked 02/08/2026
Lineage
Parent S-01188 · root S-01188
1188

Lineage

  • 02/08/2026
    Received as a full slab — root and parent are S-01188.
  • Not yet cut
    No off-cuts have been reconciled from this slab.

Movement history

Movement history
WhenActionByProject / measure lineReason
09/08/2026 2:22pmReservedDung VuPRJ-2601 · ML-01 + ML-02Book-match kitchen runs
04/08/2026 8:10amMovedDung VuDelivery zone cleared
02/08/2026 11:24amReceivedDung VuGR-0778Passed receipt inspection

Reservation

Project
PRJ-2601 — Mosman kitchen
Approved measure
Production measure v2
Measure line
ML-01 + ML-02
Measure line coverage
2.72 m² required · 2.72 m² covered · 0.00 m² remaining
Raw stock held
5.12 m² of stone held — not the area a measure line needs
Hold reason
Book-match the main kitchen runs before the balance is selected
Reserved by
Dung Vu · 09/08/2026 2:22pm
Expires
Expires 23/08/2026 Explicit expiry recorded on this reservation
Every release and every extension is recorded with its reason, and that record is kept.

Photos

Slab
Vein detail
Label

S-01188 — Hold extended

full slab · Calacatta Oro · lot LOT-A2417
Hold extended.New expiry: 06/09/2026

Current state

Stone
S-01188
Status
Reserved
Previous allocation
PRJ-2601 · Production v2 · ML-01 + ML-02
Current allocation
PRJ-2601 · Production v2 · ML-01 + ML-02
Expiry
06/09/2026

Append-only transition event

Action
Hold extended
By / at
Dung Vu · 09/08/2026 3:05pm
Required reason
Builder programme moved; preserve the selected match
Record identity
S-01188 retained; no replacement record created

S-01188 — Reservation released

full slab · Calacatta Oro · lot LOT-A2417
Reservation released.Available for a new governed reservation

Current state

Stone
S-01188
Status
In Stock
Previous allocation
PRJ-2601 · Production v2 · ML-01 + ML-02
Current allocation
— none —
Expiry

Append-only transition event

Action
Reservation released
By / at
Dung Vu · 09/08/2026 3:05pm
Required reason
Project allocation changed; this stone is no longer required
Record identity
S-01188 retained; no replacement record created

S-00418 — off-cut

Taj Mahal Quartzite · 890 × 540 × 20 mm · retained from WO-3194

Off-cut details

Status
Reserved
Stone
Taj Mahal Quartzite — leathered 20 mm
Size
890 × 540 mm · 0.48 m²
Location
K1
Parent
S-00981
Root
S-00841
Source work order
WO-3194
Retained by / on
Khoa Do · 18/06/2026
Cost carried
$141.50

Three-generation lineage

  • GR-0712
    Root S-00841 — received in lot LOT-C0901.
  • WO-3088
    Parent S-00981 — retained from the root.
  • WO-3194
    S-00418 — retained and labelled by Khoa Do.

Reservation

Project
PRJ-2604 — Randwick vanities
Approved measure
Production measure v1 · Approved
Measure line
ML-R03 — vanity top
Measure line coverage
0.42 m² required · 0.42 m² covered · 0.00 m² remaining
Raw stock held
0.48 m² of stone held — not the area a measure line needs
Hold reason
Reserve the retained match for the vanity top
Reserved by
Dung Vu · 08/08/2026 9:15am
Expires
Expires 22/08/2026 Explicit expiry recorded on this reservation
Every release and every extension is recorded with its reason, and that record is kept.

Photo and label

Off-cut face
Applied label

S-00418 — Hold extended

off-cut · Calacatta Oro · lot LOT-A2417
Hold extended.New expiry: 05/09/2026

Current state

Stone
S-00418
Status
Reserved
Previous allocation
PRJ-2604 · Production v1 · ML-R03
Current allocation
PRJ-2604 · Production v1 · ML-R03
Expiry
05/09/2026

Append-only transition event

Action
Hold extended
By / at
Dung Vu · 08/08/2026 9:35am
Required reason
Builder programme moved; preserve the selected match
Record identity
S-00418 retained; no replacement record created

S-00418 — Reservation released

off-cut · Calacatta Oro · lot LOT-A2417
Reservation released.Available for a new governed reservation

Current state

Stone
S-00418
Status
In Stock
Previous allocation
PRJ-2604 · Production v1 · ML-R03
Current allocation
— none —
Expiry

Append-only transition event

Action
Reservation released
By / at
Dung Vu · 08/08/2026 9:35am
Required reason
Project allocation changed; this stone is no longer required
Record identity
S-00418 retained; no replacement record created

Slab status outcomes

In Stock
Available stock can be selected for a governed reservation or issued to the workshop.
Available action or outcome: Reserve against an approved measure line, move it, or issue it.
Reserved
The named project, approved measure line, holder, reason and expiry remain visible.
Available action or outcome: Extend or release the hold with a reason, or issue the stone.
Issued
Workshop custody is recorded and the stone is unavailable to every other allocation.
Available action or outcome: Complete the cut reconciliation; do not create another reservation.
Consumed
The parent remains as a read-only lineage source for its components, retained off-cuts and waste.
Available action or outcome: Open the reconciliation and descendants; the physical state cannot be reversed.
Broken
The breakage reason, actor, time and cost effect remain in the movement history.
Available action or outcome: Review the loss record; the stone cannot be selected or restored.
Returned to Supplier
The supplier return and its reference remain visible beside any later valuation adjustment.
Available action or outcome: Review the return history; corrections append events rather than editing receipt cost.
Missing
The stocktake reason and cost effect remain visible while the stone is removed from search and allocation.
Available action or outcome: Review the loss record; found legacy stock is raised as a new record.