🔒WorkSession capability inactive.Work orders may be queued or assigned, but cannot progress beyond Assigned. Actual participant identity, start/finish time, duration, physical-completion, QC, rework and every dependent projection remain unavailable until the required privacy settings, staff notices and acknowledgements are accepted.
WO-3318 — Cut
PRJ-2601 · production measure v2 · source slab S-01188
Order
- Stage
- Cut
- Status
- Assigned
- Due
- 14/08/2026
- Priority
- Normal
- Assigned to
- Khoa Do
- Actually done by
- Unavailable — privacy gate
- Participants
- Unavailable — privacy gate
- Measure
- Production v2 · approved
- Slabs
- S-01188
- Instructions
- Book-match run A and B; retain every labelled off-cut.
work events
Nothing here is edited. A correction is added as its own entry, with a reason.🔒Personal work events withheld.No worker identity, start/finish timestamp, duration or session-derived event is released before the privacy gate.
Cut reconciliation unavailable
🔒No physical result is projected.The WorkOrder remains Assigned; reconciliation and dependent material cost begin only after staff-monitoring/privacy activation permits the work session.
Components
Components| Component | Measure line | Actual size | Status |
|---|
| CMP-01 | ML-01 | 2410 × 640 × 20 | Awaiting Cut |
| CMP-02 | ML-02 | 1840 × 640 × 20 | Awaiting Cut |
Quality check unavailable
🔒No QC result is projected.QC, checker identity, timestamp, evidence and rework remain unavailable while the WorkOrder is Assigned.
🔒Unavailable until activation requirements are accepted.This section illustrates behavior only after the privacy/staff-monitoring activation evidence are accepted. It is not an available action, current record or reportable projection.
WO-3319 — Factory Polish
PRJ-2601 · production measure v2 · upstream cut WO-3318
Order
- Stage
- Factory Polish
- Status
- Pending QC
- Due
- 15/08/2026
- Priority
- Urgent
- Assigned to
- Factory crew
- Actually done by
- Unavailable — privacy gate
- Participants
- Unavailable — privacy gate
- Measure
- Production v2 · approved
- Slabs
- S-01188
- Instructions
- Polish exposed edges; do not alter mitre geometry.
work events
Nothing here is edited. This polish order does not repeat the cut it followed.🔒Personal work events withheld.No worker identity, start/finish timestamp, duration or session-derived event is released before the privacy gate.
Upstream material lineage
- Cut source
- WO-3318 · Passed
- Physical consumption
- Already reconciled before this Polish stage
- QC effect
- Pass/Fail here cannot erase material cost
Components
Components| Component | Measure line | Actual size | Status |
|---|
| CMP-01 | ML-01 | 2410 × 640 × 20 | Cut |
🔒Unavailable until activation requirements are accepted.This section illustrates behavior only after the privacy/staff-monitoring activation evidence are accepted. It is not an available action, current record or reportable projection.
WO-3319 — Factory Polish
PRJ-2601 · production measure v2 · upstream cut WO-3318
Order
- Stage
- Factory Polish
- Status
- Passed
- Due
- 15/08/2026
- Priority
- Urgent
- Assigned to
- Factory crew
- Actually done by
- Unavailable — privacy gate
- Participants
- Unavailable — privacy gate
- Measure
- Production v2 · approved
- Slabs
- S-01188
- Instructions
- Polish exposed edges; do not alter mitre geometry.
work events
Nothing here is edited. This polish order does not repeat the cut it followed.🔒Personal work events withheld.No worker identity, start/finish timestamp, duration or session-derived event is released before the privacy gate.
Upstream material lineage
- Cut source
- WO-3318 · Passed
- Physical consumption
- Already reconciled before this Polish stage
- QC effect
- Pass/Fail here cannot erase material cost
Components
Components| Component | Measure line | Actual size | Status |
|---|
| CMP-01 | ML-01 | 2410 × 640 × 20 | Cut |
Quality check
- Result
- Pass
- Checked by
- Unavailable — privacy gate
- When
- Unavailable — privacy gate
- Evidence
- Finished-edge and stone-face photos retained
🔒Unavailable until activation requirements are accepted.This section illustrates behavior only after the privacy/staff-monitoring activation evidence are accepted. It is not an available action, current record or reportable projection.
WO-3319 — Factory Polish
PRJ-2601 · production measure v2 · upstream cut WO-3318
Order
- Stage
- Factory Polish
- Status
- Failed
- Due
- 15/08/2026
- Priority
- Urgent
- Assigned to
- Factory crew
- Actually done by
- Unavailable — privacy gate
- Participants
- Unavailable — privacy gate
- Measure
- Production v2 · approved
- Slabs
- S-01188
- Instructions
- Polish exposed edges; do not alter mitre geometry.
work events
Nothing here is edited. This polish order does not repeat the cut it followed.🔒Personal work events withheld.No worker identity, start/finish timestamp, duration or session-derived event is released before the privacy gate.
Upstream material lineage
- Cut source
- WO-3318 · Passed
- Physical consumption
- Already reconciled before this Polish stage
- QC effect
- Pass/Fail here cannot erase material cost
Components
Components| Component | Measure line | Actual size | Status |
|---|
| CMP-01 | ML-01 | 2410 × 640 × 20 | Cut |
Quality check
- Result
- Fail
- Checked by
- Unavailable — privacy gate
- When
- Unavailable — privacy gate
- Required reason
- Polish burn visible on CMP-01
- Next
- Raise a new linked WorkOrder; do not mutate WO-3319
🔒Unavailable until activation requirements are accepted.This section illustrates behavior only after the privacy/staff-monitoring activation evidence are accepted. It is not an available action, current record or reportable projection.
WO-3327 — Cut rework
PRJ-2601 · production measure v2 · source WO-3318 · replacement slab pending
Order
- Stage
- Cut
- Status
- Assigned
- Due
- 16/08/2026
- Priority
- Urgent
- Assigned to
- Withheld — privacy gate
- Actually done by
- Unavailable — privacy gate
- Participants
- Unavailable — privacy gate
- Measure
- Production v2 · approved
- Slabs
- Replacement slab not allocated
- Instructions
- Replace CMP-02 after internal handling breakage; match the original vein.
work events
Nothing here is edited. Waiting for work to start.🔒Personal work events withheld.No worker identity, start/finish timestamp, duration or session-derived event is released before the privacy gate.
Cut reconciliation
ℹNot created.Reconciliation is required only after this rework cut physically finishes; the source order's prior cost remains immutable.
Components
Components| Component | Measure line | Actual size | Status |
|---|
| CMP-02 | ML-02 | 1840 × 640 × 20 | Broken |
| CMP-06 | ML-02 | 1840 × 640 × 20 | Awaiting Cut |
Rework source
- Replaces
- WO-3318 · Passed before transport
- Required reason
- CMP-02 broke during internal transport to the polish station
- Replacement component
- CMP-06 supersedes CMP-02
🔒Unavailable until activation requirements are accepted.This section illustrates behavior only after the privacy/staff-monitoring activation evidence are accepted. It is not an available action, current record or reportable projection.
WO-3317 — Cut · Failed
PRJ-2604 Randwick · production measure v1 · source record remains immutable
Order
- Stage
- Cut
- Status
- Failed
- Due
- 14/08/2026
- Priority
- Urgent
- Assigned / actual
- Withheld — privacy gate / Withheld — privacy gate
- Measure
- Production v1 · Approved
- Parent slab
- S-01044 · Absolute Black · LOT-B1044 · Consumed
- Instructions
- Cut two vanity tops; verify basin cut-out centre before QC.
work events
Nothing here is edited. A failed check does not put the stone back.🔒Personal work events withheld.No worker identity, start/finish timestamp, duration or session-derived event is released before the privacy gate.
Components · exact failed lineage
Components · exact failed lineage| Component | Measure line | Actual size | Parent slab | Status |
|---|
| CMP-R01 | ML-R01 | 1200 × 500 × 20 | S-01044 | Cut |
| CMP-R02 | ML-R02 | 1200 × 500 × 20 | S-01044 | Broken |
Balanced cut reconciliation
Balanced cut reconciliation| Allocation | Area |
|---|
| Components cut | 1.20 m² |
| Retained off-cut | 2.40 m² |
| Waste / kerf | 0.98 m² |
| Parent S-01044 | 4.58 m² |
🔒Unavailable until activation requirements are accepted.This section illustrates behavior only after the privacy/staff-monitoring activation evidence are accepted. It is not an available action, current record or reportable projection.
Inactive future WorkOrder states
●QueuedThe order is ready for planning but has no active assignment or work session.
Target transition after privacy approval: Assign it to an eligible worker or crew.
●AssignedThe planned worker or crew is named and no physical work has started.
Target transition after privacy approval: Start is unavailable until the privacy gate; reassignment may remain available.
●In ProgressTarget only after the privacy gate: session and participant projection becomes visible.
Target transition after privacy approval: Finish the stage and record the required reconciliation; do not roll it back.
●Pending QCTarget only after the privacy gate: completed sessions may proceed to independent QC.
Target transition after privacy approval: Pass or fail QC; the maker cannot check their own work.
●PassedThe quality result is terminal and downstream work may rely on this exact order.
Target transition after privacy approval: Continue downstream; any later rework is a new linked work order.
●FailedThe failure reason and physical history remain immutable on the source order.
Target transition after privacy approval: Raise a new linked rework order; never reopen or overwrite this one.
State variants
These are displays of THIS screen, not new screens. Each inherits the detail archetype exemplar, which is drawn once and carries the words the built screen shows.
Work order lifecycle states