SStoneSydney stone fabrication
🔒
WorkSession capability inactive.Work orders may be queued or assigned, but cannot progress beyond Assigned. Actual participant identity, start/finish time, duration, physical-completion, QC, rework and every dependent projection remain unavailable until the required privacy settings, staff notices and acknowledgements are accepted.
Work orders/WO-3318

WO-3318 — Cut

PRJ-2601 · production measure v2 · source slab S-01188

Order

Stage
Cut
Status
Assigned
Due
14/08/2026
Priority
Normal
Assigned to
Khoa Do
Actually done by
Unavailable — privacy gate
Participants
Unavailable — privacy gate
Measure
Production v2 · approved
Slabs
S-01188
Instructions
Book-match run A and B; retain every labelled off-cut.

work events

Nothing here is edited. A correction is added as its own entry, with a reason.
🔒
Personal work events withheld.No worker identity, start/finish timestamp, duration or session-derived event is released before the privacy gate.

Cut reconciliation unavailable

🔒
No physical result is projected.The WorkOrder remains Assigned; reconciliation and dependent material cost begin only after staff-monitoring/privacy activation permits the work session.

Components

Components
ComponentMeasure lineActual sizeStatus
CMP-01ML-012410 × 640 × 20Awaiting Cut
CMP-02ML-021840 × 640 × 20Awaiting Cut

Quality check unavailable

🔒
No QC result is projected.QC, checker identity, timestamp, evidence and rework remain unavailable while the WorkOrder is Assigned.
🔒
Unavailable until activation requirements are accepted.This section illustrates behavior only after the privacy/staff-monitoring activation evidence are accepted. It is not an available action, current record or reportable projection.

WO-3319 — Factory Polish

PRJ-2601 · production measure v2 · upstream cut WO-3318

Order

Stage
Factory Polish
Status
Pending QC
Due
15/08/2026
Priority
Urgent
Assigned to
Factory crew
Actually done by
Unavailable — privacy gate
Participants
Unavailable — privacy gate
Measure
Production v2 · approved
Slabs
S-01188
Instructions
Polish exposed edges; do not alter mitre geometry.

work events

Nothing here is edited. This polish order does not repeat the cut it followed.
🔒
Personal work events withheld.No worker identity, start/finish timestamp, duration or session-derived event is released before the privacy gate.

Upstream material lineage

Cut source
WO-3318 · Passed
Physical consumption
Already reconciled before this Polish stage
QC effect
Pass/Fail here cannot erase material cost

Components

Components
ComponentMeasure lineActual sizeStatus
CMP-01ML-012410 × 640 × 20Cut

Quality check

QC outcome read-only
Finished edge
Stone face
QC only records Pass or Fail. Rework is a linked new WorkOrder with its own reason.
🔒
Unavailable until activation requirements are accepted.This section illustrates behavior only after the privacy/staff-monitoring activation evidence are accepted. It is not an available action, current record or reportable projection.

WO-3319 — Factory Polish

PRJ-2601 · production measure v2 · upstream cut WO-3318

Order

Stage
Factory Polish
Status
Passed
Due
15/08/2026
Priority
Urgent
Assigned to
Factory crew
Actually done by
Unavailable — privacy gate
Participants
Unavailable — privacy gate
Measure
Production v2 · approved
Slabs
S-01188
Instructions
Polish exposed edges; do not alter mitre geometry.

work events

Nothing here is edited. This polish order does not repeat the cut it followed.
🔒
Personal work events withheld.No worker identity, start/finish timestamp, duration or session-derived event is released before the privacy gate.

Upstream material lineage

Cut source
WO-3318 · Passed
Physical consumption
Already reconciled before this Polish stage
QC effect
Pass/Fail here cannot erase material cost

Components

Components
ComponentMeasure lineActual sizeStatus
CMP-01ML-012410 × 640 × 20Cut

Quality check

Result
Pass
Checked by
Unavailable — privacy gate
When
Unavailable — privacy gate
Evidence
Finished-edge and stone-face photos retained
🔒
Unavailable until activation requirements are accepted.This section illustrates behavior only after the privacy/staff-monitoring activation evidence are accepted. It is not an available action, current record or reportable projection.

WO-3319 — Factory Polish

PRJ-2601 · production measure v2 · upstream cut WO-3318

Order

Stage
Factory Polish
Status
Failed
Due
15/08/2026
Priority
Urgent
Assigned to
Factory crew
Actually done by
Unavailable — privacy gate
Participants
Unavailable — privacy gate
Measure
Production v2 · approved
Slabs
S-01188
Instructions
Polish exposed edges; do not alter mitre geometry.

work events

Nothing here is edited. This polish order does not repeat the cut it followed.
🔒
Personal work events withheld.No worker identity, start/finish timestamp, duration or session-derived event is released before the privacy gate.

Upstream material lineage

Cut source
WO-3318 · Passed
Physical consumption
Already reconciled before this Polish stage
QC effect
Pass/Fail here cannot erase material cost

Components

Components
ComponentMeasure lineActual sizeStatus
CMP-01ML-012410 × 640 × 20Cut

Quality check

Result
Fail
Checked by
Unavailable — privacy gate
When
Unavailable — privacy gate
Required reason
Polish burn visible on CMP-01
Next
Raise a new linked WorkOrder; do not mutate WO-3319
🔒
Unavailable until activation requirements are accepted.This section illustrates behavior only after the privacy/staff-monitoring activation evidence are accepted. It is not an available action, current record or reportable projection.

WO-3327 — Cut rework

PRJ-2601 · production measure v2 · source WO-3318 · replacement slab pending

Order

Stage
Cut
Status
Assigned
Due
16/08/2026
Priority
Urgent
Assigned to
Withheld — privacy gate
Actually done by
Unavailable — privacy gate
Participants
Unavailable — privacy gate
Measure
Production v2 · approved
Slabs
Replacement slab not allocated
Instructions
Replace CMP-02 after internal handling breakage; match the original vein.

work events

Nothing here is edited. Waiting for work to start.
🔒
Personal work events withheld.No worker identity, start/finish timestamp, duration or session-derived event is released before the privacy gate.

Cut reconciliation

Not created.Reconciliation is required only after this rework cut physically finishes; the source order's prior cost remains immutable.

Components

Components
ComponentMeasure lineActual sizeStatus
CMP-02ML-021840 × 640 × 20Broken
CMP-06ML-021840 × 640 × 20Awaiting Cut

Rework source

Replaces
WO-3318 · Passed before transport
Required reason
CMP-02 broke during internal transport to the polish station
Replacement component
CMP-06 supersedes CMP-02
🔒
Unavailable until activation requirements are accepted.This section illustrates behavior only after the privacy/staff-monitoring activation evidence are accepted. It is not an available action, current record or reportable projection.

WO-3317 — Cut · Failed

PRJ-2604 Randwick · production measure v1 · source record remains immutable

Order

Stage
Cut
Status
Failed
Due
14/08/2026
Priority
Urgent
Assigned / actual
Withheld — privacy gate / Withheld — privacy gate
Measure
Production v1 · Approved
Parent slab
S-01044 · Absolute Black · LOT-B1044 · Consumed
Instructions
Cut two vanity tops; verify basin cut-out centre before QC.

work events

Nothing here is edited. A failed check does not put the stone back.
🔒
Personal work events withheld.No worker identity, start/finish timestamp, duration or session-derived event is released before the privacy gate.

Components · exact failed lineage

Components · exact failed lineage
ComponentMeasure lineActual sizeParent slabStatus
CMP-R01ML-R011200 × 500 × 20S-01044Cut
CMP-R02ML-R021200 × 500 × 20S-01044Broken
Any rework must name WO-3317 and the replaced Component; this source record remains Failed and immutable.

Balanced cut reconciliation

Balanced cut reconciliation
AllocationArea
Components cut1.20 m²
Retained off-cut2.40 m²
Waste / kerf0.98 m²
Parent S-010444.58 m²
🔒
Unavailable until activation requirements are accepted.This section illustrates behavior only after the privacy/staff-monitoring activation evidence are accepted. It is not an available action, current record or reportable projection.

Inactive future WorkOrder states

Queued
The order is ready for planning but has no active assignment or work session.
Target transition after privacy approval: Assign it to an eligible worker or crew.
Assigned
The planned worker or crew is named and no physical work has started.
Target transition after privacy approval: Start is unavailable until the privacy gate; reassignment may remain available.
In Progress
Target only after the privacy gate: session and participant projection becomes visible.
Target transition after privacy approval: Finish the stage and record the required reconciliation; do not roll it back.
Pending QC
Target only after the privacy gate: completed sessions may proceed to independent QC.
Target transition after privacy approval: Pass or fail QC; the maker cannot check their own work.
Passed
The quality result is terminal and downstream work may rely on this exact order.
Target transition after privacy approval: Continue downstream; any later rework is a new linked work order.
Failed
The failure reason and physical history remain immutable on the source order.
Target transition after privacy approval: Raise a new linked rework order; never reopen or overwrite this one.