Projects/PRJ-2601

PRJ-2601 — Mosman kitchen & butler's pantry

Created from enquiry 04/07/2026 · Harbourline Constructions · coordinator Sarah Mitchell
StatusIn Productionproduction measure v2 in force since 09/08/2026
Work orders finished1 of 4WO-3319 is with QC · three orders still to run
Due on site18/08/2026builder ready 14/08/2026
Reserved stone2 slabsS-01187 and S-01188 · zone K1

Project activity

  1. 04/07/2026
    Project created from the enquiry · Sarah Mitchell allocated PRJ-2601 and attached Harbourline's Rev A drawings.
  2. 20/07/2026
    Quote measure v1 marked Final · measured by Mark Reilly and used to price QT-1188.
  3. 22/07/2026
    QT-1188 v1 sent · the sent revision was locked while the customer decided.
  4. 29/07/2026
    QT-1188 marked Won · the project moved from Quoting to Measuring and kept its code.
  5. 06/08/2026
    VAR-0139 accepted by the customer · the butler's pantry splashback joined the scope.
  6. 07/08/2026
    Production measure v1 returned by Hung Le · the island cut-out centre disagreed with the cabinet datum.
  7. 09/08/2026
    Production measure v2 approved by Hung Le · the signed sheet is on file and v2 is in force for the four open work orders.
  8. 11/08/2026
    PKG-2601-01 accepted · the crane and transport package is Planned for 17/08/2026.
  9. 12/08/2026
    WO-3319 sent to QC · Tuan Pham and Nam Vo completed the factory-polish work.

Quick facts

Customer
Harbourline Constructions
Main contact
Mark Reilly
Site
8 Raglan St, Mosman NSW 2088
Site contact
Tim Foley · 0491 570 010
Coordinator
Sarah Mitchell
Enquiry created
04/07/2026
Builder ready
14/08/2026
Due on site
18/08/2026
Stone
S-01187 and S-01188 · Calacatta Oro LOT-A2417 · Reserved in K1
Subcontract package
PKG-2601-01 · Planned · due 17/08/2026

Measure versions

Open measure sheet
Measure versions for PRJ-2601
VersionMeasuredStatusApproval
v3Production measure12/08/2026 · Peter WalshDraftsplashback height re-checked against the site datumNot submitted — v2 stays in force
v2Production measure09/08/2026 · Peter WalshApproved09/08/2026 · Hung Leproduction-measure-v2-signed.pdf
v1Production measure07/08/2026 · Peter WalshSupersededreplaced when v2 was approved07/08/2026 · returned by Hung Le
v1Quote measure20/07/2026 · Mark ReillyFinalpriced QT-1188 v1Not required
Production v2 is the revision all four open work orders are cut to.

Pieces and measure lines

7 pieces
Pieces and measure lines for PRJ-2601
ComponentMeasure linePosition / actual sizeSpecificationSlab allocationWork order
CMP-01ML-01Run A · 2410 × 640 × 20Mitred 40 edge · 1 cut-out · undermount sinkS-01188WO-3318Assigned
CMP-02ML-02Run B · 1840 × 640 × 20Mitred 40 edge · no cut-outS-01188WO-3318Assigned
CMP-03ML-03Island top · 2800 × 1100 × 20Mitred 40 edge · 1 cut-out · cooktopS-01187WO-3319Pending QC
CMP-04ML-03Waterfall left · 900 × 1100 × 20Mitred 40 edge · vein continues from the topS-01187WO-3319Pending QC
CMP-05ML-03Waterfall right · 900 × 1100 × 20Mitred 40 edge · vein continues from the topS-01187WO-3319Pending QC
CMP-06ML-04Butler's pantry bench · 2260 × 620 × 20Pencil round edge · 1 cut-out · drop-in sinkNot allocatedWO-3320Queued
CMP-07ML-05Splashback · 3100 × 600 × 20Pencil round edge · verify against the site datumNot allocated—no work order raised yet
7 pieces on production measure v2 — 5 are cut from S-01187 and S-01188; CMP-06 sits on queued order WO-3320 and CMP-07 has no work order yet.

Current work orders

All work orders
Current work orders on PRJ-2601
OrderStageAssigned toActually done byMeasureDueStatus
WO-3318CutKhoa Do—Production v214/08/2026Assigned
WO-3319Factory PolishFactory crewTuan Pham · Nam VoProduction v215/08/2026Pending QC
WO-3320Cut——Production v217/08/2026Queued
WO-3327DeliverInstall A—Production v224/08/2026Assigned
Four work orders are open on PRJ-2601 — WO-3319 is with QC and WO-3320 still needs a cutter.

Stone reserved for this job

2 slabs
Stone reserved for PRJ-2601
SlabStone / lotSizeLocationStatus
S-01187Calacatta OroLOT-A24173200 × 1600 × 205.12 m²K1Reserved
S-01188Calacatta OroLOT-A24173200 × 1600 × 205.12 m²K1Reserved
Both slabs are held in zone K1 for PRJ-2601 and cannot be issued to another job.

Files and drawings

3 files
Files and drawings on PRJ-2601
FileCategoryVersionDate
Mosman-kitchen-plan-RevC.pdfDrawingv306/08/2026
Harbourline-contract-PRJ2601.pdfContractv130/07/2026
production-measure-v2-signed.pdfMeasure evidencev109/08/2026
Rev C is the drawing the workshop is cutting to. Earlier revisions stay on file against the work that used them.

PRJ-2601 — Mosman · Cancelled

Cancelled 12/08/2026 by Sarah Mitchell · the job code and its history are kept
⛔
Cancelled. No new work order, measure or claim may be raised against PRJ-2601.

Cancellation event

Status
Cancelled
Cancelled by / at
Sarah Mitchell · 12/08/2026 4:42pm
Reason
Builder cancelled the stone scope after the cabinet programme changed
Project code
PRJ-2601 · unchanged
Quotes and measures
QT-1188, VAR-0139 and production measure v2 keep their revision histories

Consequences

Stone
S-01187 and S-01188 released through reasoned stock movements
Work orders
WO-3318, WO-3319, WO-3320 and WO-3327 keep their recorded history and close with a reason
Subcontract package
PKG-2601-01 cancelled before work started
Customer
Harbourline Constructions notified on 12/08/2026

Stage trail

In Production
Stage trail for PRJ-2601
StageOn this jobDateDetail
EnquiryPassed04/07/2026Project code allocated; Harbourline's Rev A drawings attached.
QuotingPassed22/07/2026QT-1188 v1 sent and retained as the won revision.
LostNot entered—QT-1188 was won on 29/07/2026, so no lost outcome is recorded.
MeasuringPassed29/07/2026Production measure v1 was followed by the approved v2 revision.
ApprovedPassed09/08/2026Production measure v2 is the effective fabrication revision.
In ProductionCurrent10/08/2026Work started 10/08/2026 — WO-3319 is finished and waiting on QC; WO-3318, WO-3320 and WO-3327 remain open.
Ready to DeliverNot yet—WO-3319 is with QC and WO-3320 is queued; no piece is packed for the Mosman run.
InstallingNot yet—No install visit is booked for 8 Raglan St, Mosman.
HandoverNot yet—Due on site 18/08/2026; nothing has been handed to Harbourline yet.
ClosedNot yet—The current project remains In Production.
CancelledNot entered—No cancellation has been recorded against PRJ-2601.
Planned1 package11/08/2026PKG-2601-01 is planned and due 17/08/2026.
ActiveNone—No subcontract package on PRJ-2601 is active.
CompletedNone—No subcontract package on PRJ-2601 is complete.
Planned, Active and Completed track PKG-2601-01, the crane and transport package on this job.