WorkSession capability inactive.Work orders may be queued or assigned, but cannot progress beyond Assigned. Actual participant identity, start/finish time, duration, physical-completion, QC, rework and every dependent projection remain unavailable until the required privacy settings, staff notices and acknowledgements are accepted.
Book-match run A and B; retain every labelled off-cut.
work events
Nothing here is edited. A correction is added as its own entry, with a reason.
🔒
Personal work events withheld.No worker identity, start/finish timestamp, duration or session-derived event is released before the privacy gate.
Cut reconciliation unavailable
🔒
No physical result is projected.The WorkOrder remains Assigned; reconciliation and dependent material cost begin only after staff-monitoring/privacy activation permits the work session.
Components
Components
Component
Measure line
Actual size
Status
CMP-01
ML-01
2410 × 640 × 20
Awaiting Cut
CMP-02
ML-02
1840 × 640 × 20
Awaiting Cut
Quality check unavailable
🔒
No QC result is projected.QC, checker identity, timestamp, evidence and rework remain unavailable while the WorkOrder is Assigned.
🔒
Unavailable until activation requirements are accepted.This section illustrates behavior only after the privacy/staff-monitoring activation evidence are accepted. It is not an available action, current record or reportable projection.
WO-3319 — Factory Polish
PRJ-2601 · production measure v2 · upstream cut WO-3318
QC only records Pass or Fail. Rework is a linked new WorkOrder with its own reason.
🔒
Unavailable until activation requirements are accepted.This section illustrates behavior only after the privacy/staff-monitoring activation evidence are accepted. It is not an available action, current record or reportable projection.
WO-3319 — Factory Polish
PRJ-2601 · production measure v2 · upstream cut WO-3318
Unavailable until activation requirements are accepted.This section illustrates behavior only after the privacy/staff-monitoring activation evidence are accepted. It is not an available action, current record or reportable projection.
WO-3319 — Factory Polish
PRJ-2601 · production measure v2 · upstream cut WO-3318
Raise a new linked WorkOrder; do not mutate WO-3319
🔒
Unavailable until activation requirements are accepted.This section illustrates behavior only after the privacy/staff-monitoring activation evidence are accepted. It is not an available action, current record or reportable projection.
Replace CMP-02 after internal handling breakage; match the original vein.
work events
Nothing here is edited. Waiting for work to start.
🔒
Personal work events withheld.No worker identity, start/finish timestamp, duration or session-derived event is released before the privacy gate.
Cut reconciliation
ℹ
Not created.Reconciliation is required only after this rework cut physically finishes; the source order's prior physical consumption remains immutable.
CMP-02 broke during internal transport to the polish station
Replacement component
CMP-06 supersedes CMP-02
🔒
Unavailable until activation requirements are accepted.This section illustrates behavior only after the privacy/staff-monitoring activation evidence are accepted. It is not an available action, current record or reportable projection.
WO-3317 — Cut · Failed
PRJ-2604 Randwick · production measure v1 · source record remains immutable
Cut two vanity tops; verify basin cut-out centre before QC.
work events
Nothing here is edited. A failed check does not put the stone back.
🔒
Personal work events withheld.No worker identity, start/finish timestamp, duration or session-derived event is released before the privacy gate.
Components · exact failed lineage
Components · exact failed lineage
Component
Measure line
Actual size
Parent slab
Status
CMP-R01
ML-R01
1200 × 500 × 20
S-01044
Cut
CMP-R02
ML-R02
1200 × 500 × 20
S-01044
Broken
Any rework must name WO-3317 and the replaced Component; this source record remains Failed and immutable.
Balanced cut reconciliation
Balanced cut reconciliation
Allocation
Area
Components cut
1.20 m²
Retained off-cut
2.40 m²
Waste / kerf
0.98 m²
Parent S-01044
4.58 m²
🔒
Unavailable until activation requirements are accepted.This section illustrates behavior only after the privacy/staff-monitoring activation evidence are accepted. It is not an available action, current record or reportable projection.
Inactive future WorkOrder states
●
Queued
The order is ready for planning but has no active assignment or work session.
Target transition after privacy approval: Assign it to an eligible worker or crew.
●
Assigned
The planned worker or crew is named and no physical work has started.
Target transition after privacy approval: Start is unavailable until the privacy gate; reassignment may remain available.
●
In Progress
Target only after the privacy gate: session and participant projection becomes visible.
Target transition after privacy approval: Finish the stage and record the required reconciliation; do not roll it back.
●
Pending QC
Target only after the privacy gate: completed sessions may proceed to independent QC.
Target transition after privacy approval: Pass or fail QC; the maker cannot check their own work.
●
Passed
The quality result is terminal and downstream work may rely on this exact order.
Target transition after privacy approval: Continue downstream; any later rework is a new linked work order.
●
Failed
The failure reason and physical history remain immutable on the source order.
Target transition after privacy approval: Raise a new linked rework order; never reopen or overwrite this one.
✓
WO-3320 moved from Queued to Assigned.The order remains bound to approved production v2; Pending v3 is not used.
These are displays of THIS screen, not new screens. Each inherits the detail archetype exemplar, which is drawn once and carries the words the built screen shows.