SStoneSydney stone fabrication
🔒
Customer-home evidence inactive.Site and installation photographs, customer signatures, refusal details and substitute-evidence metadata are not captured or returned until the privacy purpose, notice, access and retention controls are accepted.
Install visits/Planned visit

Install visit — Planned

Scheduling and non-personal operational data remain available.

Available now

Status
Planned
Permitted work
Maintain date, crew, vehicle and planned component manifest within the role grant.
Blocked progression
Delivered, Installed, Signed Off, Refused and Closed are unavailable until customer-home privacy evidence is accepted.
Blocked content
Photographs, signature/refusal evidence, install outcomes, defects and customer-evidence metadata are not returned.
🔒
Unavailable until activation requirements are accepted.This section illustrates behavior only after the customer-home privacy evidence is accepted. It is not an available action, current record, count or reportable projection.

PRJ-2598 — visit 9, unit 9

12/08/2026 · Install A · Peter Walsh, Minh Ha · truck 1
Delivery docketHandover packCoordinator closes after the report and punch-item guard pass

Pieces taken

Pieces taken
PiecePositionSize (mm)Visit-line disposition
CMP-118Unit 9 kitchen — run A2200 × 620Installed
CMP-119Unit 9 kitchen — run B1600 × 620Installed
CMP-120Unit 9 splashback2200 × 600Installed
CMP-121Main vanity1500 × 460Installed
CMP-122Second vanity900 × 460Installed
CMP-123Window sill1200 × 200Returned to factory — wrong size

Customer-site photographs unavailable

🔒
UnavailableNo customer-home image, thumbnail, attachment name or storage path is captured or returned until lawful purpose, notice, access and retention controls are accepted.

Supervisor report

Save reportCoordinator schedules return visit
Return visit needed

Defects

Add defect
Defects
CodeDescriptionRaised byStatusOwner
PI-088Window sill CMP-123 is 40 mm out, returned to be recutPeter WalshOpenNam Tran
Rework order
PI-087Silicone to the left wall corner not done — builder's tradePeter WalshOpen
While a defect is open the install record cannot be closed, and the project cannot move to Handover.

Customer signature evidence unavailable

🔒
UnavailableNo signer identity, role, signature, timestamp, note, refusal reason, threshold decision or substitute-evidence metadata is captured or returned before the required setup opens.
🔒
Customer-evidence transition unavailableThe refusal, threshold and substitute-evidence policy is not exposed as an active path until the required privacy setup is accepted.

Inactive future Install Visit states

Planned is the only operational state before privacy approval. Every later state below is a non-operative target reference.

Planned
The date, team, vehicle and expected components are ready before site departure.
Target transition after privacy approval: Record delivery when the pieces reach site.
Delivered
Site delivery and component custody are recorded before installation begins.
Target transition after privacy approval: Record installed pieces, returns and defects; customer-site photographs remain unavailable pending privacy configuration.
Installed
Installed components and evidence are visible while the customer outcome is pending.
Target transition after privacy approval: Signature and refusal transitions remain unavailable until the required privacy setup is accepted.
Signed Off
Customer evidence is unavailable.
Target transition after privacy approval: Close only after every punch item is resolved.
Refused
Signature-refusal evidence is unavailable.
Target transition after privacy approval: Close only after every punch item and evidence requirement is resolved.
Closed
The visit is read-only and no punch item remains open.
Target transition after privacy approval: Review operational closure only; customer evidence remains unavailable pending privacy configuration.