Install visits/Visit 9 — unit 9

PRJ-2598 — visit 9, unit 9

11/08/2026 · Install A · Peter Walsh, Minh Ha · truck 1 · Sterling Build Group

Pieces taken

6 pieces
Pieces taken to unit 9
PiecePositionSize (mm)Visit-line disposition
CMP-118Unit 9 kitchen — run A2200 × 620Installed
CMP-119Unit 9 kitchen — run B1600 × 620Installed
CMP-120Unit 9 splashback2200 × 600Installed
CMP-121Main vanity1500 × 460Installed
CMP-122Second vanity900 × 460Installed
CMP-123Window sill1200 × 200Returned to factory — wrong size
Five of six pieces are installed. CMP-123 went back to the factory on truck 1 and is booked into the return visit.

Supervisor report

Return visit neededFiled 11/08/2026 3:10pm by Peter Walsh.

Defects

2 open
Punch items raised on this visit
CodeDescriptionRaised byStatusOwner
PI-088Window sill CMP-123 is 40 mm out, returned to be recutPeter WalshOpenNam Tran
PI-087Silicone to the left wall corner not done — builder’s tradePeter WalshOpen—
While a defect is open the install record cannot be closed, and the project cannot move to Handover.

Visit trail

Signed Off
Visit trail for visit 9
StateOn this visitDateDetail
PlannedPassed07/08/2026Booked for 11/08/2026: Install A, truck 1, six pieces for unit 9.
DeliveredPassed11/08/2026Six pieces unloaded at 12 Help St, Chatswood and signed onto site at 7:40am.
InstalledPassed11/08/2026Five pieces installed by 1:20pm; window sill CMP-123 went back on the truck to be recut.
Signed OffCurrent11/08/2026Amanda Cho signed on site at 2:55pm with the sill and the silicone noted against the visit.
RefusedNot entered—No refusal was recorded: the customer signed.
ClosedNot yet—Closing waits on PI-088 and PI-087. Until both are resolved PRJ-2598 cannot move to Handover.
Visit 9 was signed on site on 11/08/2026. It stays open until both punch items are resolved, and the crew is back at Chatswood today for unit 10.