PRJ-2601 — Mosman
Harbourline Constructions · 8 Raglan St, Mosman NSW 2088 · created from the enquiry on 04/07/2026Main projects start at Enquiry. Subcontract packages start at Planned against a parent project.
Project identity
Main-project terms
Required when MainSet on this project; there is no customer default
Released on practical completion
Subcontract-package fields
Required when PackageA package keeps its own schedule and costs, and rolls into its parent project once it is completed.
Create
A main project is created at Enquiry, ready to measure and quote. A subcontract package is created at Planned against its parent project.
Current lifecycle
In Production- Status
- In Production — production measure v2 in force since 09/08/2026
- Contract value
- $50,780.00 — won original QT-1188 $48,600.00 plus accepted variation VAR-0139 $2,180.00
- Spent to date
- $31,240.00
- Due on site
- 18/08/2026 · builder ready 14/08/2026
- Subcontract package
- PKG-2601-01 · Planned · due 17/08/2026
Status changes are made from the project’s own actions, not from this form.
State variants
- empty — inherits form-empty
- loading — inherits form-loading
- access denied — inherits form-access-denied
- validation error — inherits form-validation-error
These are displays of THIS screen, not new screens. Each inherits the form archetype exemplar.