Install visits/New visitIV-0912

IV-0912 — PRJ-2601 Mosman

18/08/2026, 7:00am to 11:00am · Install A · truck 1 · Harbourline Constructions · 8 Raglan St, Mosman NSW 2088A visit is booked against one project, one crew and one vehicle. The pieces you tick are measured against the vehicle before the visit is saved.
Planned

Visit

Only projects past Approved are offered
Issued when you saveIV-0912 · visit 1 of PRJ-2601
Issued once and never re-used
PRJ-2601 is due on site 18/08/2026
8 Raglan St, Mosman NSW 2088
Taken from the project

Crew and vehicle

Install A is free on 18/08/2026
Install B is at PRJ-2590 Willoughby that morning
The driver carries the delivery docket
Fitters on this visit
Two fitters for four hours · 8.00 h of labour

Pieces on this visit

PRJ-2601 · production measure v2, approved 09/08/20265 of 5 ticked
Components that can go on the Mosman install visit
TakeComponentMeasure linePieceSize (mm)AreaWork orderStage
CMP-01ML-01Benchtop run A2410 × 640 × 201.54 m²WO-3318Awaiting cut
CMP-02ML-02Benchtop run B1840 × 640 × 201.18 m²WO-3318Awaiting cut
CMP-03ML-03Island top2800 × 1100 × 203.08 m²WO-3319Pending QC
CMP-04ML-03Waterfall end, left900 × 1100 × 200.99 m²WO-3319Pending QC
CMP-05ML-03Waterfall end, right900 × 1100 × 200.99 m²WO-3319Pending QC
5 pieces on the truck7.78 m²
WO-3318 is due 14/08/2026 and WO-3319 is with the quality checker. The truck is loaded only once both orders pass their check.

Vehicle capacity

Pass
Vehicle
Truck 1 · 12.00 m² deck · 1,000 kg
Deck used
7.78 m² of 12.00 m² · 65%
Weight
420 kg of 1,000 kg · 42% at 54 kg/m² for 20 mm marble
A-frames
2 of 4 · island top and both waterfall ends stand on one frame
Second visit
Not needed — the whole of measure v2 fits on one truck
The check is taken again when the visit is saved, and the result it gave is kept with the visit.

Save

A saved visit joins the install calendar for 18/08/2026 and reaches Install A on the crew phone that morning. Mark Reilly is told the same day.