Order
- Stage
- Cut
- Status
- Assigned
- Project
- PRJ-2601 · Mosman kitchen
- Due
- 14/08/2026
- Priority
- Normal
- Assigned to
- Khoa Do
- Actually done by
- —
- Measure
- Production v2 · approved 09/08/2026
- Slab
- S-01188 · Calacatta Oro · LOT-A2417
- Instructions
- Book-match run A and B; retain every labelled off-cut.
Work events
3 entries · 09/08/2026 to 11/08/2026- 09/08/2026 2:22pmSlab S-01188 reserved by Dung Vu for ML-01 + ML-02.
- 10/08/2026 9:12amOrder created from production measure v2 by Sarah Mitchell.
- 11/08/2026 4:20pmAssigned to Khoa Do by Nam Tran.
Material
- Source slab
- S-01188 · full slab
- Stone
- Calacatta Oro — marble 20 mm
- Lot
- LOT-A2417
- Size
- 3200 × 1600 mm · 5.12 m²
- Location
- K1 · main warehouse
- Reserved for
- ML-01 + ML-02 · 2.72 m² of 5.12 m²
- Slab cost
- $1,486.00 · locked at GR-0778
Components
Main kitchen runs A and B from measure v2| Component | Measure line | Size (mm) | Area | Status |
|---|---|---|---|---|
| CMP-01 | ML-01 | 2410 × 640 × 20 | 1.54 m² | Awaiting cut |
| CMP-02 | ML-02 | 1840 × 640 × 20 | 1.18 m² | Awaiting cut |
| 2 components | 2.72 m² | |||
Quality check
🔍No check yet
WO-3318 is not on the saw yet. The check opens when Khoa Do finishes the cut.
WO-3319 — Factory Polish
PRJ-2601 Mosman kitchen · production measure v2 · island pieces from S-01187
Order
- Stage
- Factory Polish
- Status
- Pending QC
- Project
- PRJ-2601 · Mosman kitchen
- Due
- 15/08/2026
- Priority
- Urgent
- Assigned to
- Factory crew
- Actually done by
- Tuan Pham · Nam Vo
- Finished
- 12/08/2026 11:45am · 4.75 h
- Labour posted
- 4.75 h at $65.00/h · $308.75
- Measure
- Production v2 · approved 09/08/2026
- Slab
- S-01187 · Calacatta Oro · LOT-A2417
- Instructions
- Polish exposed edges; do not alter mitre geometry.
Work events
4 entries · 12/08/2026- 12/08/2026 7:00amStarted by Tuan Pham at the polish bench.
- 12/08/2026 9:30amNam Vo joined the order.
- 12/08/2026 11:45amFinished by Tuan Pham · 4.75 h recorded for two people.
- 12/08/2026 11:47amSent for quality check.
Material
- Source slab
- S-01187 · full slab
- Stone
- Calacatta Oro — marble 20 mm
- Lot
- LOT-A2417
- Cut on
- 07/08/2026 · island pieces released to the polish bench
- Pieces
- CMP-03, CMP-04, CMP-05
- Material issued
- $1,486.00 · slab issue posted 11/08/2026
Components
Island top and both waterfall ends| Component | Measure line | Size (mm) | Area | Status |
|---|---|---|---|---|
| CMP-03 | ML-03 | 2800 × 1100 × 20 | 3.08 m² | Polished |
| CMP-04 | ML-03 | 900 × 1100 × 20 | 0.99 m² | Polished |
| CMP-05 | ML-03 | 900 × 1100 × 20 | 0.99 m² | Polished |
| 3 components | 5.06 m² | |||
Quality check
- Result
- Awaiting check
- Sent for check
- 12/08/2026 11:47am by Tuan Pham
- Checked by
- —
- Evidence
- 2 photos attached


Pending QC since 12/08/2026 11:47am · order due 15/08/2026.
Work orders in production
Six orders on PRJ-2601, PRJ-2604 and PRJ-2607.
| Order | Project | Stage | Assigned to | Actually done by | Due | Status |
|---|---|---|---|---|---|---|
| WO-3320 | PRJ-2601Mosman kitchen | Cut | — | — | 17/08/2026 | Queued |
| WO-3318 | PRJ-2601Mosman kitchen | Cut | Khoa Do | — | 14/08/2026 | Assigned |
| WO-3322 | PRJ-2607Neutral Bay island | Cut | Nam Vo | Nam Vo | 18/08/2026 | In Progress |
| WO-3319 | PRJ-2601Mosman kitchen | Factory Polish | Factory crew | Tuan Pham · Nam Vo | 15/08/2026 | Pending QC |
| WO-3314 | PRJ-2604Randwick vanities | Cut | Khoa Do | Khoa Do | 10/08/2026 | Passed |
| WO-3315 | PRJ-2604Randwick vanities | Edge Grind | Tuan Pham | Tuan Pham | 11/08/2026 | Failed |
✓
WO-3320 created in Queued.Cut stage · CMP-06 butler’s pantry bench · due 17/08/2026 3:00pm.
WO-3320 — Cut
Queued- Project
- PRJ-2601 · Mosman kitchen
- Stage
- Cut
- Slab
- S-00422 · Calacatta Oro off-cut · 1.69 m²
- Measure revision
- MS-2601 v2 — approved, in force
- Components
- CMP-06 · butler’s pantry bench 2260 × 620 × 20
- Performed by
- In-house
- Due
- 17/08/2026 3:00pm
- Priority
- Normal
- Assignment
- — none yet —
- Created by
- Sarah Mitchell · 12/08/2026 10:05am
WO-3314 — Cut
PRJ-2604 Randwick vanities · production measure v1 · off-cut S-00418
Order
- Stage
- Cut
- Status
- Passed
- Project
- PRJ-2604 · Randwick 2 vanities
- Due
- 10/08/2026
- Priority
- Normal
- Assigned to
- Khoa Do
- Actually done by
- Khoa Do
- Finished
- 10/08/2026 9:35am · 1.50 h
- Labour posted
- 1.50 h at $65.00/h · $97.50
- Measure
- Production v1 · approved 04/08/2026
- Slab
- S-00418 · Taj Mahal Quartzite · LOT-C0901
- Instructions
- Cut the second vanity top; keep the basin cut-out centred on the pencil line.
Work events
3 entries · 10/08/2026- 10/08/2026 8:05amStarted by Khoa Do on saw 2.
- 10/08/2026 9:35amFinished by Khoa Do · 1.50 h recorded.
- 10/08/2026 3:05pmPassed by Nam Tran.
Material
- Source
- S-00418 · off-cut
- Stone
- Taj Mahal Quartzite — 20 mm
- Lot
- LOT-C0901
- Size
- 890 × 540 mm · 0.48 m²
- Location
- K1 · main warehouse
- Material issued
- $141.50 · off-cut issue posted 08/08/2026
Components
Vanity 2 top| Component | Measure line | Size (mm) | Area | Status |
|---|---|---|---|---|
| CMP-R03 | ML-R03 | 850 × 480 × 20 | 0.41 m² | Cut |
| 1 component | 0.41 m² | |||
Quality check
- Result
- Pass
- Checked by
- Nam Tran
- When
- 10/08/2026 3:05pm
- Evidence
- Finished-edge and stone-face photos retained


Cut released to Edge Grind on 11/08/2026.
WO-3315 — Edge Grind
PRJ-2604 Randwick vanities · production measure v1 · component CMP-R03
⚠
Quality check failed.Front edge profile 2 mm out of square, recorded 11/08/2026 3:35pm by Nam Tran. Redone by WO-3316, due 13/08/2026.
Order
- Stage
- Edge Grind
- Status
- Failed
- Project
- PRJ-2604 · Randwick 2 vanities
- Due
- 11/08/2026
- Priority
- Normal
- Assigned to
- Tuan Pham
- Actually done by
- Tuan Pham
- Finished
- 11/08/2026 2:50pm · 2.50 h
- Labour posted
- 2.50 h at $65.00/h · $162.50
- Measure
- Production v1 · approved 04/08/2026
- Component
- CMP-R03 · vanity 2 top
- Instructions
- Grind and polish the front edge to the 20 mm pencil profile.
Work events
3 entries · 11/08/2026- 11/08/2026 12:20pmStarted by Tuan Pham on grinder 1.
- 11/08/2026 2:50pmFinished by Tuan Pham · 2.50 h recorded.
- 11/08/2026 3:35pmFailed by Nam Tran — front edge profile 2 mm out of square.
Redo
- Redone by
- WO-3316 · Edge Grind · In Progress
- Raised
- 11/08/2026 4:10pm by Nam Tran
- Reason carried
- Front edge profile 2 mm out of square
- Stone
- None issued — CMP-R03 is re-ground
Components
Vanity 2 top| Component | Measure line | Size (mm) | Area | Status |
|---|---|---|---|---|
| CMP-R03 | ML-R03 | 850 × 480 × 20 | 0.41 m² | Rejected |
| 1 component | 0.41 m² | |||
Quality check
- Result
- Fail
- Checked by
- Nam Tran
- When
- 11/08/2026 3:35pm
- Reason
- Front edge profile 2 mm out of square along 480 mm.
- Evidence
- 2 photos retained


CMP-R03 stays on the floor — no stone re-issued for the redo.
Order
- Stage
- Edge Grind
- Status
- In Progress
- Project
- PRJ-2604 · Randwick 2 vanities
- Due
- 13/08/2026
- Priority
- Urgent
- Assigned to
- Tuan Pham
- Actually done by
- Tuan Pham
- Started
- 12/08/2026 1:15pm · running now
- Labour so far
- 1.25 h at $65.00/h · $81.25
- Measure
- Production v1 · approved 04/08/2026
- Component
- CMP-R03 · vanity 2 top
- Instructions
- Re-grind the front edge square to the pencil profile; check with the straight edge before finishing.
Work events
3 entries · 11/08/2026 to 12/08/2026- 11/08/2026 4:10pmRaised by Nam Tran as the redo of WO-3315.
- 11/08/2026 4:25pmAssigned to Tuan Pham by Nam Tran.
- 12/08/2026 1:15pmStarted by Tuan Pham on grinder 1.
Rework source
- Replaces
- WO-3315 · Edge Grind · Failed
- Reason
- Front edge profile 2 mm out of square along 480 mm.
- Component
- CMP-R03 re-ground — no new stone issued
- Hours already spent
- 2.50 h · $162.50 retained on WO-3315
Components
Vanity 2 top| Component | Measure line | Size (mm) | Area | Status |
|---|---|---|---|---|
| CMP-R03 | ML-R03 | 850 × 480 × 20 | 0.41 m² | On the grinder |
| 1 component | 0.41 m² | |||
Quality check
🔍No check yet
Tuan Pham is on grinder 1 now. The check opens when the grind is finished.
WO-3315 — Edge Grind · Failed
PRJ-2604 Randwick vanities · kept as history · redone by WO-3316
⛔
Failed.Closed 11/08/2026 3:35pm by Nam Tran with 2.50 h and 2 photos on the record. Redone by WO-3316, due 13/08/2026.
Order
- Stage
- Edge Grind
- Status
- Failed
- Project
- PRJ-2604 · Randwick 2 vanities
- Due
- 11/08/2026
- Assigned to
- Tuan Pham
- Actually done by
- Tuan Pham
- Worked
- 11/08/2026 12:20pm – 2:50pm · 2.50 h
- Labour retained
- $162.50 · posted to PRJ-2604 on 11/08/2026
- Measure
- Production v1 · approved 04/08/2026
- Redone by
- WO-3316 · due 13/08/2026
Work events
4 entries · 11/08/2026- 11/08/2026 12:20pmStarted by Tuan Pham on grinder 1.
- 11/08/2026 2:50pmFinished by Tuan Pham · 2.50 h recorded.
- 11/08/2026 3:35pmFailed by Nam Tran — front edge profile 2 mm out of square.
- 11/08/2026 4:10pmWO-3316 raised by Nam Tran as the redo.
Quality result
- Result
- Fail
- Checked by
- Nam Tran
- When
- 11/08/2026 3:35pm
- Reason
- Front edge profile 2 mm out of square along 480 mm.
- Evidence
- 2 photos retained
Component lineage
The same piece is re-ground on WO-3316| Component | Measure line | Source | Area | Status on this order |
|---|---|---|---|---|
| CMP-R03 | ML-R03 | S-00418 | 0.41 m² | Rejected |
No stone was issued to this order; the grind consumed labour only.
Photos


State variants
Lifecycle display states for the primary Work Order record
- Queued — state view
- Assigned — state view
- In Progress — state view
- Pending QC — state view
- Passed — state view
- Failed — state view
Only declared primary-entity lifecycle states are registered here. More specific examples rendered elsewhere on the page remain interaction, revision or material-condition states rather than extra lifecycle states.