S-01188 — full slab
Calacatta Oro · lot LOT-A2417 · 3200 × 1600 × 20 mm
Move
Full slab details
- Status
- Reserved
- Stone
- Calacatta Oro — marble 20 mm
- Lot
- LOT-A2417 · 4 slabs in this lot
- Size
- 3200 × 1600 mm · 5.12 m²
- Finish
- Polished
- Location
- K1 · main warehouse
- Cost
- $1,486.00
- Goods receipt
- GR-0778 · cost locked 02/08/2026
- Lineage
- Parent S-01188 · root S-01188
1188
Lineage
- 02/08/2026Received as a full slab — root and parent are S-01188.
- Not yet cutNo off-cuts have been reconciled from this slab.
Movement history
| When | Action | By | Project / measure line | Reason |
|---|---|---|---|---|
| 09/08/2026 2:22pm | Reserved | Dung Vu | PRJ-2601 · ML-01 + ML-02 | Book-match kitchen runs |
| 04/08/2026 8:10am | Moved | Dung Vu | — | Delivery zone cleared |
| 02/08/2026 11:24am | Received | Dung Vu | GR-0778 | Passed receipt inspection |
Reservation
- Project
- PRJ-2601 — Mosman kitchen
- Approved measure
- Production measure v2
- Measure line
- ML-01 + ML-02
- Measure line coverage
- 2.72 m² required · 2.72 m² covered · 0.00 m² remaining
- Raw stock held
- 5.12 m² of stone held — not the area a measure line needs
- Hold reason
- Book-match the main kitchen runs before the balance is selected
- Reserved by
- Dung Vu · 09/08/2026 2:22pm
- Expires
- Expires 23/08/2026 Explicit expiry recorded on this reservation
Every release and every extension is recorded with its reason, and that record is kept.
Photos



S-01188 — Hold extended
full slab · Calacatta Oro · lot LOT-A2417
⏱
Hold extended.New expiry: 06/09/2026
Current state
- Stone
- S-01188
- Status
- Reserved
- Previous allocation
- PRJ-2601 · Production v2 · ML-01 + ML-02
- Current allocation
- PRJ-2601 · Production v2 · ML-01 + ML-02
- Expiry
- 06/09/2026
Append-only transition event
- Action
- Hold extended
- By / at
- Dung Vu · 09/08/2026 3:05pm
- Required reason
- Builder programme moved; preserve the selected match
- Record identity
- S-01188 retained; no replacement record created
Slab lifecycle
Available states and governed next steps for this record.
| State | When shown | What happens next |
|---|---|---|
| In Stock | This is the initial stock state and it may also be re-entered from Reserved. The In Stock state keeps its audit history and only the appropriate controls remain available. | Available next: Reserved (Warehouse; conditions apply); Issued (Warehouse); Broken (Warehouse; conditions apply); Returned to Supplier (Warehouse; conditions apply); Missing (Warehouse; conditions apply). |
| Reserved | Reached from In Stock. The Reserved state keeps its audit history and only the appropriate controls remain available. | Available next: In Stock (Warehouse); Issued (Warehouse). |
| Issued | Reached from Reserved, In Stock. The Issued state keeps its audit history and only the appropriate controls remain available. | Available next: Consumed (Worker at cut reconciliation). |
| Consumed | Reached from Issued. The Consumed state keeps its audit history and only the appropriate controls remain available. | No next lifecycle transition is declared; retain the record as governed history. |
| Broken | Reached from In Stock. The Broken state keeps its audit history and only the appropriate controls remain available. | No next lifecycle transition is declared; retain the record as governed history. |
| Returned to Supplier | Reached from In Stock. The Returned to Supplier state keeps its audit history and only the appropriate controls remain available. | No next lifecycle transition is declared; retain the record as governed history. |
| Missing | Reached from In Stock. The Missing state keeps its audit history and only the appropriate controls remain available. | No next lifecycle transition is declared; retain the record as governed history. |
State variants
Lifecycle display states for the primary Slab record
- In Stock — state view
- Reserved — state view
- Issued — state view
- Consumed — state view
- Broken — state view
- Returned to Supplier — state view
- Missing — state view
Only declared primary-entity lifecycle states are registered here. More specific examples rendered elsewhere on the page remain interaction, revision or material-condition states rather than extra lifecycle states.
S-01188 — Reservation released
full slab · Calacatta Oro · lot LOT-A2417
✓
Reservation released.Available for a new governed reservation
Current state
- Stone
- S-01188
- Status
- In Stock
- Previous allocation
- PRJ-2601 · Production v2 · ML-01 + ML-02
- Current allocation
- — none —
- Expiry
- —
Append-only transition event
- Action
- Reservation released
- By / at
- Dung Vu · 09/08/2026 3:05pm
- Required reason
- Project allocation changed; this stone is no longer required
- Record identity
- S-01188 retained; no replacement record created
S-00418 — off-cut
Taj Mahal Quartzite · 890 × 540 × 20 mm · retained from WO-3194
Move
Off-cut details
- Status
- Reserved
- Stone
- Taj Mahal Quartzite — leathered 20 mm
- Size
- 890 × 540 mm · 0.48 m²
- Location
- K1
- Parent
- S-00981
- Root
- S-00841
- Source work order
- WO-3194
- Retained by / on
- Khoa Do · 18/06/2026
- Cost carried
- $141.50
Three-generation lineage
- GR-0712Root S-00841 — received in lot LOT-C0901.
- WO-3088Parent S-00981 — retained from the root.
- WO-3194S-00418 — retained and labelled by Khoa Do.
Reservation
- Project
- PRJ-2604 — Randwick vanities
- Approved measure
- Production measure v1 · Approved
- Measure line
- ML-R03 — vanity top
- Measure line coverage
- 0.42 m² required · 0.42 m² covered · 0.00 m² remaining
- Raw stock held
- 0.48 m² of stone held — not the area a measure line needs
- Hold reason
- Reserve the retained match for the vanity top
- Reserved by
- Dung Vu · 08/08/2026 9:15am
- Expires
- Expires 22/08/2026 Explicit expiry recorded on this reservation
Every release and every extension is recorded with its reason, and that record is kept.
Photo and label


S-00418 — Hold extended
off-cut · Calacatta Oro · lot LOT-A2417
⏱
Hold extended.New expiry: 05/09/2026
Current state
- Stone
- S-00418
- Status
- Reserved
- Previous allocation
- PRJ-2604 · Production v1 · ML-R03
- Current allocation
- PRJ-2604 · Production v1 · ML-R03
- Expiry
- 05/09/2026
Append-only transition event
- Action
- Hold extended
- By / at
- Dung Vu · 08/08/2026 9:35am
- Required reason
- Builder programme moved; preserve the selected match
- Record identity
- S-00418 retained; no replacement record created
S-00418 — Reservation released
off-cut · Calacatta Oro · lot LOT-A2417
✓
Reservation released.Available for a new governed reservation
Current state
- Stone
- S-00418
- Status
- In Stock
- Previous allocation
- PRJ-2604 · Production v1 · ML-R03
- Current allocation
- — none —
- Expiry
- —
Append-only transition event
- Action
- Reservation released
- By / at
- Dung Vu · 08/08/2026 9:35am
- Required reason
- Project allocation changed; this stone is no longer required
- Record identity
- S-00418 retained; no replacement record created