WorkSession capability inactive.WorkOrders may be queued or assigned, but cannot progress beyond Assigned. Actual participant identity, start/finish time, duration, physical completion, QC, rework and every dependent projection remain unavailable until the required privacy settings, staff notices and acknowledgements are accepted.
Money
Cost ledger
One place for all three cost sources. Material and hours flow in on their own; direct costs are entered here.
This monthUnavailableno combined total while Source 2 is withheld
Source 1 — materialUnavailablepost-cut reconciliation is inactive
Source 2 — hoursUnavailablestaff-monitoring/privacy activation required
Source 3 — entered$15,400.00categorised, with a reason
Cost entries
| Date | Project | Source | Group | Origin record | Amount |
|---|---|---|---|---|---|
| 12/08/2026 | PRJ-2601 Mosman | Source 3 | Site materials | CE-1051 — silicone, adhesive | $92.00 |
| 11/08/2026 | Factory overhead | Source 3 | Machine maintenance | CE-1049 — saw blade change | $860.00 |
| 09/08/2026 | PRJ-2604 Randwick | Source 3 | Subcontractor | CE-1042 — edge work | $1,850.00 |
Append-only. A mistake is fixed by a reversing entry with a reason, never by deleting.
State variants
- empty — inherits list-empty
- loading — inherits list-loading
- access denied — inherits list-access-denied
- validation error — inherits list-validation-error
These are displays of THIS screen, not new screens. Each inherits the list archetype exemplar, which is drawn once and carries the words the built screen shows.