Signed Off| State | On this visit | Date | Detail |
|---|---|---|---|
| Planned | Passed | 07/08/2026 | Booked for 11/08/2026: Install A, truck 1, six pieces for unit 9. |
| Delivered | Passed | 11/08/2026 | Six pieces unloaded at 12 Help St, Chatswood and signed onto site at 7:40am. |
| Installed | Passed | 11/08/2026 | Five pieces installed by 1:20pm; window sill CMP-123 went back on the truck to be recut. |
| Signed Off | Current | 11/08/2026 | Amanda Cho signed on site at 2:55pm with the sill and the silicone noted against the visit. |
| Refused | Not entered | — | No refusal was recorded: the customer signed. |
| Closed | Not yet | — | Closing waits on PI-088 and PI-087. Until both are resolved PRJ-2598 cannot move to Handover. |
Visit 9 was signed on site on 11/08/2026. It stays open until both punch items are resolved, and the crew is back at Chatswood today for unit 10.
✓
IV-0912 scheduled in Planned.The saved visit keeps the vehicle-capacity check that passed when it was created.
IV-0912 — PRJ-2601 Mosman
Planned- Visit type
- Install
- Date / shift
- 18/08/2026 · 7:00am to 11:00am
- Performed by
- In-house crew · Install A
- Vehicle / driver
- Truck 1 · Peter Walsh
- Components
- CMP-01 island top, CMP-02 waterfall end · both cut and waiting on polish
- Capacity check
- Pass 8.6 m² of 12.0 m² · 346 kg of 1,000 kg
- Site contact
- Mark Reilly · 0491 570 006
State variants
Lifecycle display states for the primary Install Visit record
- Planned — state view
- Delivered — state view
- Installed — state view
- Signed Off — state view
- Refused — state view
- Closed — state view
Only declared primary-entity lifecycle states are registered here. More specific examples rendered elsewhere on the page remain interaction, revision or material-condition states rather than extra lifecycle states.